Asuelimen, G (2020) ADVANCED RISK MANAGEMENT OF AN ARCTIC MARINE SEISMIC SURVEY OPERATION. Doctoral thesis, Liverpool John Moores University.
|
Text
2020gregoryasuelimenphd.pdf.pdf - Published Version Download (7MB) | Preview |
Abstract
This research is motivated by the lack of a robust risk management framework addressing the high risks in Arctic Marine Seismic Survey Operations (AMSSO), and the lack of transparent decision-making in Arctic shipping risk management globally. The literature review carried out herein reveals that the AMSSO and Arctic navigation involve significant risks caused by human elements and the unique features of this region. These known risk factors combine to constitute a ship-ice collision risk. This last represents the goal of the research investigation. With the complexity of the AMSSO system, three technical chapters are proposed to analyse and reduce the risks in the AMSSO. The first technical chapter deals with local risk analysis of the system. Herein, a Fuzzy Rule-based methodology is developed employing the probability distribution assessment in the form of belief degrees with Bayesian Network (BN) and Failure Mode and Effect Analysis (FMEA) for estimating the risk parameters of each hazard event using a computer-aided analysis. A case study of the application of the proposed risk model – Fuzzy Rule-based Bayesian Network (FRBN) –, in the Greenland, Iceland and Norwegian Seas (GNIS) AMSSO is carried out to identify the most critical hazard event in the prospect oil field. The second technical chapter deals with the global safety performance of the Ship-Ice Collision model dovetailing the Evidential Reasoning (ER) technique and Analytic Hierarchy Process (AHP) with the FRBN. A trial application of the global safety performance of the Ship-Ice Collision case in a prospect oil field is carried out to determine the safety level of AMSSO, measured against a developed benchmark risk. The outcome of the investigation reveals the Risk Influence Factor (RIF) of each hazard event in AMSSO. Since the risk level is far above the tolerable region of the developed benchmark risk, several Risk Control Options (RCOs) are investigated in the last technical chapter to reduce and control the critical risks. This technical chapter finalises the risk management framework developed in this research. In a trial application of reducing a critical risk in AMSSO, AHP-TOPSIS is utilised to find a balance between cost and benefit in selecting the most appropriate RCO at the heart of several RCOs and their associated criteria. The novelty of this research lies in the fact that it tackles the major concerns in risk analysis (concerns such as dynamic event risk analysis, hazard data uncertainties, and hazard event dependencies) of a complex system. More also, it adopts a hybrid methodology that offers a non-monotonic utility output to select the most appropriate RCO amongst several RCOs and conflicting criteria, to reduce the critical risks in AMSSO, in an economically viable strategy.
Item Type: | Thesis (Doctoral) |
---|---|
Uncontrolled Keywords: | Arctic Marine Seismic Survey Operation; Risk analysis; Risk management; Handling uncertainty in risk data |
Subjects: | G Geography. Anthropology. Recreation > G Geography (General) G Geography. Anthropology. Recreation > GE Environmental Sciences T Technology > T Technology (General) T Technology > TC Hydraulic engineering. Ocean engineering |
Divisions: | Maritime & Mechanical Engineering (merged with Engineering 10 Aug 20) |
Date Deposited: | 29 Apr 2020 08:38 |
Last Modified: | 21 Dec 2022 12:10 |
DOI or ID number: | 10.24377/LJMU.t.00012843 |
Supervisors: | Blanco, E, Zaili, Y and Matellini, B |
URI: | https://researchonline.ljmu.ac.uk/id/eprint/12843 |
View Item |