Items where Author is "Sawhney, A"
Up a level |
Article
Kapogiannis, G, Palaios, P and Sawhney, A (2024) Digital Construction led Growth Asymmetries in Europe: The need for Collaborative Culture. Construction Economics and Building, 24 (1/2).
Mittal, Y, Paul, VK, Rostami, A, Riley, ML and Sawhney, A (2020) Delay factors in construction of healthcare infrastructure projects: a comparison amongst developing countries. Asian Journal of Civil Engineering, 21. pp. 649-661. ISSN 1563-0854
Ahuja, R, Sawhney, A and Arif, M (2018) Developing Organizational Capabilities to Deliver Lean and Green Project Outcomes using BIM. Engineering, Construction and Architectural Management, 25 (10). pp. 1255-1276. ISSN 0969-9988
Ahuja, R, Sawhney, A, Jain, M, Arif, M and Rakshit, S (2018) Factors influencing BIM adoption in emerging markets—the case of India. International Journal of Construction Management. ISSN 1562-3599
Swamy, RRDTV, Tiwari, P and Sawhney, A (2018) Assessing determinants of PPP project performance: Applying AHP to urban drinking water sector in India. Property Management, 36 (1). pp. 67-85. ISSN 0263-7472
Singh, MM, Sawhney, A and Sharma, V (2017) Utilising Building Component Data from BIM for Formwork Planning. Construction Economics and Building, 17 (4). ISSN 2204-9029
Singh, MM, Sawhney, A and Borrmann, A (2017) Integrating rules of modular coordination to improve model authoring in BIM. International Journal of Construction Management. pp. 1-17. ISSN 1562-3599
Dixit, S, Mandal, SN, Sawhney, A and Singh, S (2017) Area of linkage between lean construction and sustainability in indian construction industry. International Journal of Civil Engineering and Technology, 8 (8). ISSN 0976-6308
Dixit, S, Mandal, SN, Sawhney, A and Singh, S (2017) Relationship between skill development and productivity in construction sector: A literature review. International Journal of Civil Engineering and Technology, 8 (8). pp. 649-665. ISSN 0976-6308
Ahuja, R, Sawhney, A and Arif, M (2016) Driving lean and green project outcomes using BIM: A qualitative comparative analysis. International Journal of Sustainable Built Environment. ISSN 2212-6090
Ahuja, R, Jain, M, Sawhney, A and Arif, M (2016) Adoption of BIM by architectural firms in India: technology–organization–environment perspective. Architectural Engineering and Design Management, 12 (4). pp. 311-330. ISSN 1745-2007
Kovvuri, PRR, Sawhney, A, Ahuja, R and Sreekumar, A (2016) Efficient Project Delivery Using Lean Principles - An Indian Case Study. Journal of The Institution of Engineers (India): Series A, 97 (1). pp. 19-26. ISSN 2250-2149
Singh, MM, Sawhney, A and Borrmann, A (2015) Modular Coordination and BIM: Development of Rule Based Smart Building Components. Procedia Engineering, 123. pp. 519-527. ISSN 1877-7058
Nanyam, VN, Basu, R, Sawhney, A and Prasad, JK (2015) Selection Framework for Evaluating Housing Technologies. Procedia Engineering, 123. pp. 333-341. ISSN 1877-7058
Abrishami, S, Goulding, J, Rahimian, FP, Ganah, A and Sawhney, A (2014) G-BIM framework and development process for integrated AEC design automation. Procedia Engineering, 85. pp. 10-17. ISSN 1877-7058
Sawhney, A, Mukherjee, KK, Rahimian, FP and Goulding, JS (2014) Scenario thinking approach for leveraging ICT to support SMEs in the Indian construction industry. Procedia Engineering, 85. pp. 446-453. ISSN 1877-7058
Sawhney, A and Singhal, P (2013) Drivers and Barriers to the Use of Building Information Modelling in India. International Journal of 3-D Information Modeling, 2 (3). pp. 46-63. ISSN 2156-1710
Sawhney, A and Maheswari, JU (2013) Design Coordination Using Cloud-based Smart Building Element Models. International Journal of Computer Information Systems and Industrial Management Applications, 5 (2013). pp. 445-453. ISSN 2150-7988
Arif, M, Bendi, D, Sawhney, A and Iyer, KC (2012) State of offsite construction in India-Drivers and barriers. Journal of Physics: Conference Series, 364 (1). ISSN 1742-6588
Conference or Workshop Item
Nanyam, VPSN, Sawhney, A and Gupta, PA (2017) Evaluating Offsite Technologies for Affordable Housing. In: Procedia Engineering , 196. pp. 135-143. (Creative Construction Conference 2017, 19 June 2017 - 22 June 2017, Primosten, Croatia).
Nanyam, VPSN, Basu, R, Sawhney, A, Vikram, H and Lodha, G (2017) Implementation of Precast Technology in India–Opportunities and Challenges. In: Procedia Engineering , 196. pp. 144-151. (Creative Construction Conference 2017, 19 June 2017 - 22 June 2017, Primosten, Croatia).
Sharma, S, Sawhney, A and Arif, M (2017) Parametric Modelling for Designing Offsite Construction. In: Procedia Engineering , 196. pp. 1114-1121. (Creative Construction Conference 2017, 19 June 2017 - 22 June 2017, Primosten, Croatia).
Ahuja, R, Sawhney, A and Arif, M (2017) Prioritizing BIM Capabilities of an Organization: An Interpretive Structural Modeling Analysis. In: Procedia Engineering , 196. pp. 2-10. (Creative Construction Conference 2017, 19 June 2017 - 22 June 2017, Primosten, Croatia).
Basu, R, Nanyam, VPSN and Sawhney, A (2017) A Multi-dimensional Subcontractor Evaluation Framework for Nonconventional Housing Systems. In: Procedia Engineering , 196. pp. 253-261. (Creative Construction Conference 2017, CCC 2017, 19 June 2017 - 22 June 2017, Primosten, Croatia).