Facial reconstruction

Search LJMU Research Online

Browse Repository | Browse E-Theses

Items where Author is "Shah, RK"

Up a level
Export as [feed] Atom [feed] RSS
Group by: Item Type | No Grouping
Number of items: 33.

Article

Kraidi, L, Shah, RK, Matipa, WM and Borthwick, F (2021) An Investigation of mitigating the Safety and Security Risks allied with Oil and Gas Pipeline Project: a case study in Iraq. Journal of Pipeline Science and Engineering, 1 (3). pp. 349-359. ISSN 2667-1433

Shah, RK, Layth, K, Matipa, WM and Borthwick, F (2021) Analysing Delay Impact from Potential Risk Factors on Project Delivery of Oil and Gas Pipeline: A Case Study in Iraq. Journal of Construction Research, 2 (2). pp. 42-55. ISSN 2630-5089

Shah, RK, Al Shereiqi, K and Borthwick, F (2021) A Study of Challenges and Benefits of Lean Construction (LC) Principles in Omani Construction Industry. Journal of Construction Research, 2 (2). pp. 16-29. ISSN 2630-5089

Kraidi, L, Shah, RK, Matipa, WM and Borthwick, F (2020) Using stakeholders’ judgement and fuzzy logic theory to analyze the risk influencing factors in oil and gas pipeline projects: Case study in Iraq, Stage II. International Journal of Critical Infrastructure Protection, 28. ISSN 1874-5482

Kraidi, L, Shah, RK, Matipa, WM and Borthwick, F (2019) Analyzing Stakeholders' Perceptions of the Critical Risk Factors in Oil and Gas Pipeline Projects. Periodica Polytechnica Architecture. ISSN 0324-590X

Shah, RK and Alqarni, M (2018) An Investigation of Health and Safety issues at Highway Construction sites in developing countries. Journal of Advanced College of Engineering and Management, 4. pp. 83-93. ISSN 2392-4853

Shah, RK and Barkas, L (2018) Analysing the impact of e-learning technology on students’ engagement, attendance and performance. Research in Learning Technology, 26. ISSN 2156-7069

Kraidi, L, Shah, RK, Matipa, WM and Borthwick, F (2018) Analysing the Critical Risk Factors associated with Oil and Gas Pipeline Projects in Iraq. International Journal of Critical Infrastructure Protection, 24. pp. 14-22. ISSN 1874-5482

Shah, RK, Ugona, CU, Ochieng, EG and Matipa, WM (2018) Strategies for Enhancing Strategic Project Management in Public Research Projects: Case Nigeria. World Review of Science, Technology and Sustainable Development, 13 (4). pp. 352-365. ISSN 1741-2242

Shah, RK and Alotaibi, M (2018) A study of unethical practices in the construction industry and potential preventive measures. Journal of Advanced College of Engineering and Management, 3. pp. 55-77. ISSN 2392-4853

Shah, RK, McMann, O and Borthwick, F (2017) Challenges and prospects of applying asset management principles to Highway maintenance: A case study of the UK. Transportation Research Part A: Policy and Practice, 97. pp. 231-243. ISSN 0965-8564

Shah, RK (2016) An Exploration Of Causes For Delay And Cost Overrun In Construction Projects: A Case Study Of Australia, Malaysia & Ghana. Journal of Advanced College of Engineering and Management, 2 (1). pp. 41-55. ISSN 2392-4853

Shah, RK and Edwards, J (2016) Investigation of health and safety impact from the ‘Site BIM’ tools in the live construction sites. Journal of Construction Engineering and Project Management, 6 (2). pp. 1-7. ISSN 2233-9582

Shah, RK (2015) Earthwork planning and visualisation of time-location information in road construction projects. Journal of Advanced College of Engineering and Management, 1 (1). pp. 1-9. ISSN 2392-4853

Shah, RK, Shebob, A and Mhalas, A (2013) A Review of Customer Satisfaction Factors in Libyan Housing Projects. Journal of Construction Engineering and Project Management, 3 (4). pp. 26-34.

Shah, RK, Dawood, N and Castro, S (2008) Automatic generation of progress profiles for eathwork operations using 4D visualisation model. Electronic Journal of Information Technology in Construction, 13. pp. 491-456. ISSN 1874-4753

Conference or Workshop Item

Shah, RK, Kraidi, L, Matipa, WM and Borthwick, F (2022) A Model for Delay Analysis Impact at Planning Phase of Oil & Gas Pipeline Projects: A case of Iraq. In: EPiC Series in Built Environment: ASC 2022, 58th Annual Associated Schools of Construction International Conference: , 3. pp. 299-307. (ASC2022: 58th Annual Associated Schools of Construction International Conference, 20th-23rd April 2022, Atlanta, GA, United States).

Kraidi, L, Shah, RK, Matipa, WM and Borthwick, F (2018) An Analysis of the Critical Risk Factors in Oil and Gas Pipeline Projects using a Comprehensive Risk Management Framework. In: ARCOM Conference Proceedings . pp. 360-369. (Association of Researchers in Construction Management 34th (ARCOM 4th), 03 September 2018 - 05 September 2018, Belfast).

Kraidi, L, Shah, RK, Matipa, WM and Borthwick, F (2018) Analyzing the Critical Risk Factors in Oil and Gas Pipelines Projects Regarding the Perceptions of the Stakeholders. In: CCC 2018 - Proceedings . (Creative Construction Conference 2018, 30 June 2018 - 03 July 2018, Ljubljana, Slovenia).

Kraidi, L, Shah, RK, Matipa, WM and Borthwick, F (2018) The Development of a Questionnaire Survey to Investigate the Critical Risk Factors in Oil and Gas Pipelines Projects. In: CCC 2018 - Proceedings . (Creative Construction Conference 2018, 30 June 2018 - 03 July 2018, Ljubljana, Slovenia).

Kraidi, L, Shah, RK, Matipa, WM and Borthwick, F (2018) Analysing the Critical Risk Factors of Oil and Gas Pipeline Projects in Iraq. In: The 3rd BUiD Doctoral Research Conference 2017 Proceedings . pp. 133-148. (The3rd BUiD Doctoral Research Conference, 13 May 2017 - 13 May 2017, The British University in Dubai).

Shah, RK and Edwards, J (2016) A study of ‘Site BIM’ impact on health and safety in construction sites. In: 16th International Conference on Construction Application of Virtual Reality (CONVR),, 12 December 2016 - 13 November 2016, Hong Kong. (Accepted)

Shah, RK and Dawood, N (2013) Automatic generation and visualisation of location-based scheduling. In: Proceedings of the 13th International Conference on Construction Applications of Virtual Reality . (Proceedings of the 13th International Conference on Construction Applications of Virtual Reality, 30th -31st October 2013, London, UK).

Shah, RK, Walsh, S and Ross, A (2013) Challenges, potential flaws and resolutions in implementing FRP in UK Rail infrastructure. In: Proceedings of the 29th Annual ARCOM Conference . pp. 123-134. (29th Annual ARCOM Conference, 2nd - 4th September 2013, Reading, UK).

Shah, RK, Dawood, N, Dean, J and Castro, S (2009) A Virtual Construction Model of 4D planning in Road Project. In: Proceedings 25th Annual ARCOM Conference , 2. pp. 1091-100. (Annual ARCOM Conference, 7th - 9th Sep 2009, Nottingham, UK).

Shah, RK and Dawood, N (2008) Improving Communication of Scheduling Information of Earthworks using 4D Visualisation Model in Road Projects. In: Proceedings of CIB 25th W78 . (CIB W78 2008 International Conference on Information Technology in Construction, 15th - 17th Jul 2008, Santiago, Chile).

Shah, RK and Dawood, N (2007) An Innovative Approach for Improvement of Communications through Visual Schedule Model in Road Construction. In: 7th International Conference on Construction Application of Virtual Reality . pp. 216-223. (CONVR 2007: 7th International Conference on Construction Application of Virtual Reality, 22nd - 23rd Oct 2007, PA, USA).

Kraidi, L, Shah, RK, Matipa, WM and Borthwick, F Application of Fuzzy Based Model to Manage the Critical Risk Factors in Oil and Gas Pipeline Projects. In: ICIDM 2018 – 5th International Conference on Interactive Digital Media, 11 December 2018 - 12 December 2018, Liverpool, UK. (Accepted)

Kraidi, L, Shah, RK, Matipa, WM and Borthwick, F Application of Fuzzy Logic Theory on Risk Assessment in Oil and Gas Pipeline Projects. In: ASC 2019 International Conference . (ASC 2019 International Conference, 10-13 April 2019, Denver, Colorado, USA). (Accepted)

Kraidi, L, Shah, RK, Matipa, W, Borthwick, F and Hashim, KS Development of Risk Optimisation Model for Oil and Gas Transportation Pipeline Routes. In: The International Conference on Civil and Environmental Engineering Technologies (ICCEET), 23 April 2019 - 24 April 2019, University of Kufa, Iraq. (Accepted)

Kraidi, L, Shah, RK, Matipa, WM and Borthwick, F Investigation of the Risk Factors Causing Safety and Delay Issues in Oil and Gas Pipeline Construction Projects. In: Procedia Manufacturing . (15th Global Congress on Manufacturing and Management (GCMM-2020), 7th - 9th June 2021, Liverpool, UK).

Ugonna, CU, Ochieng, EG, Mapita, W and Shah, RK Strategic Project management (SPM): An empirical perspective on the practice in pubic organisation. In: The 6th International conference on management, finance and Enterprise (ICMFE-2015), 17 October 2015 - 18 October 2015, Istanbul city, Turkey. (Accepted)

Ugonna, CU, Ochieng, G, Mapita, W and Shah, RK Strategic for enhancing the Application of strategic project Management (SPM) in Research Organisation: case of Nigeria. In: International Conference on organisation and management (ICOM-2015)., 22 November 2015 - 23 November 2015, Abu Dhabi, UAE. (Accepted)

This list was generated on Sat Apr 20 14:26:15 2024 UTC.