Investigation of the Risk Factors Causing Safety and Delay Issues in Oil and Gas Pipeline Construction Projects

Kraidi, L, Shah, RK, Matipa, WM and Borthwick, F Investigation of the Risk Factors Causing Safety and Delay Issues in Oil and Gas Pipeline Construction Projects. In: Procedia Manufacturing . (15th Global Congress on Manufacturing and Management (GCMM-2020), 7th - 9th June 2021, Liverpool, UK).

[img]
Preview
Text
GCMM2020 _ Paper ID 266.pdf - Accepted Version
Available under License Creative Commons Attribution Non-commercial No Derivatives.

Download (990kB) | Preview

Abstract

Building the new Oil and Gas Pipelines (OGPs) without analyzing the potential Risk Factors (RFs) that influence the safety of these pipelines causes time and cost overrun in these projects. Quantifying the impact of the RFs on the duration of the projects is essential to provide an accurate estimate about the project duration and recognize the potential RFs that causing delay and safety issues in the projects. Identifying the RFs in the projects via literature review and analyzing their impact on the delivery time of the projects via a questionnaire survey and computer-based risk analysis model are the key methods adopted in the study. This study uses the Monte Carlo Simulation algorithm, which is integrated within @Risk Simulator to quantify the delay impact of the RFs. The @Risk simulator has the flexibility to integrated different risk distribution methods for each RF, which helps in overcoming the limitations of using ASTA Powerproject risk simulator to quantify the delay the projects, as done in a prior study. The @Risk simulator is useful in analyzing the delay in each task, working stage and overall project duration. The results provided by risk simulator is useful in understanding the sensitivity and the criticality of each RF that might cause delay issues in the projects. The outcomes of this study will help to the stakeholders, the decision-makers and the policy-makers of OGP projects to make sound decisions and enable them to take preventive actions of risk management while starting a new OGP project, which helps in minimizing the delay in the projects

Item Type: Conference or Workshop Item (Paper)
Uncontrolled Keywords: 0910 Manufacturing Engineering, 1007 Nanotechnology
Subjects: H Social Sciences > HD Industries. Land use. Labor
H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TP Chemical technology
Divisions: Civil Engineering and Built Environment
Publisher: Elsevier
Date Deposited: 13 Sep 2021 12:10
Last Modified: 13 Feb 2024 15:13
URI: https://researchonline.ljmu.ac.uk/id/eprint/15482
View Item View Item