Facial reconstruction

Search LJMU Research Online

Browse Repository | Browse E-Theses

Settlement behaviour of hybrid asphalt-ballast railway tracks

Yu, Z, Connolly, DP, Woodward, PK and Laghrouche, O (2019) Settlement behaviour of hybrid asphalt-ballast railway tracks. Construction and Building Materials, 208. ISSN 0950-0618

[img]
Preview
Text
Settlement behaviour of hybrid asphalt-ballast railway tracks - accepted version.pdf - Accepted Version
Available under License Creative Commons Attribution Non-commercial No Derivatives.

Download (2MB) | Preview

Abstract

The use of structural asphalt layers inside ballasted railway tracks is attractive because it can increase track bending stiffness. Therefore, for the first time, this paper investigates the long-term settlement characteristics of asphaltic track in the presence of a subgrade stiffness transition zone. Phased load cyclic compression laboratory tests are performed on a large-scale hybrid asphalt-ballast track, supported by subgrade with varying stiffness. It is found that an asphaltic layer acts as a bridge to shield the subgrade from high stresses. It is also found that the asphalt reduces track settlement, and is particularly effective when subgrade stiffness is low.

Item Type: Article
Uncontrolled Keywords: 0905 Civil Engineering, 1202 Building
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Engineering
Publisher: Elsevier
Related URLs:
Date Deposited: 07 Apr 2022 10:00
Last Modified: 07 Apr 2022 10:00
DOI or ID number: 10.1016/j.conbuildmat.2019.03.047
URI: https://researchonline.ljmu.ac.uk/id/eprint/16613
View Item View Item